SAAB with painting equipment etc. up to Harkstead client first thing.
Then PM back with the extra four wheels to the Nuffield.
Late evening run to Wicks – but back via town as the bridge was blocked – as was town it turned out with the Wherstead Road dug up again – so it took me almost an hour and a half.
