So the first task was to put the fan heater on the E-type for an hour or so in preparation for the startup. I did notice quite a patch of water under the car so I’ll have to investigate that.
Next job was to spring the Ferrari and set the tyre pressures back to normal. I hesitated as it looked like it was raining – but it was the pollen from the Yew trees falling like snow. I backed the car out and within seconds it was peppered with white flecks.
I moved it to the front of the drive and got to work. By the time I had done the tyres I had also decided to take bubble down. By the time that was packed away about 40 minutes later it looked like this.
Next was firing up the E-type – which it did after a long churn – obviously lacking fuel after the storage period – but that warmed up quickly.
Next was a run to the boat [to deliver the hose] via Harkstead for jobs and packing in some leftover kitchen.
Back home I cleaned the Ferrari windscreen and set off for a blast – quite a long one as it turned out. To start with the clutch pedal seemed to squeak – but it quickly went away. Odd.
The fast run got rid of most of the pollen too – not that you can tell it’s dirty here – but spot that great parking. Filled with fuel on the way back too.
Then I had time for another SAAB jaunt to collect the rest of the old kitchen ahead of another dump run. Finally a night time taxi job to take Oli to pick up his car.




